Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Use a single stream recovery rather than a multi-streamed recovery for the libraries that have files involved in the referential constraint
  2. If the related objects are all in a single library, and if that library is saved using a save-while-active command, then IBM i is able to handle this situation.
  3. If the save is a parallel-parallel save, and the recovery is done with the same number of drives as the save, then IBM i is able to handle the situation. (** Question ... Does this handle both the case where all the related objects are in 1 library, and also when they are in multiple libraries?) 

These considerations for customers with referential constraints are in addition to those described in the sections below.

...